SERVING SAUDI ARABIA & GULF REGION

LIGHTWEIGHT, PUMPABLE LCC SOLUTIONS

Engineered solutions.
For complex ground conditions.

TUSANID provides engineered LCC solutions for ground settlement, underground voids, pipe and trench backfilling, and ground stabilization, with on-site production and pumping.

LCC placement on site
LIGHTWEIGHT CELLULAR CONCRETEOn-site production. Controlled placement.
00ABOUT TUSANID

About Tusanid

Purpose: Provide LCC Solutions for Complex Ground Challenges

Construction and infrastructure projects frequently encounter severe ground and subsurface conditions, including soil settlement, hidden underground voids, structural instability, weak support zones, and shifting utility routes.

Tusanid solves these challenges through advanced Lightweight Cellular Concrete (LCC) InLine Technology. By enabling high-volume, on-site LCC production with consistent quality, we equip clients to implement practical, high-performance engineering solutions—specializing in confined spaces, subterranean voids, and restricted-access sites.

Key Challenges We Address

  • Ground Settlement: Restoring structural support and reducing foundation-related risks.
  • Underground Voids: Efficiently filling cavities, sinkholes, and abandoned subterranean spaces.
  • Utility Protection: Stabilizing pipes, trenches, and service routes against displacement.
  • Restricted Access: Delivering high-performance fill material directly to difficult-to-reach areas.

Lightweight

Reduced added load for suitable ground applications.

Pumpable

Reaches confined and difficult-access areas.

LCC placement around services in a confined area
InLine technology for on-site LCC production and pumping
01

Engineered Backfilling

02

Trench & Pipe Backfilling

03

Void Filling

04

Ground Stabilization

01LCC TECHNOLOGY FOR DIFFICULT AREAS

Flowable. Lightweight. Engineered around the application.

Lightweight and pumpable for suitable applications. Flowable and self-leveling placement behavior can support confined spaces and underground voids.

Using InLine technology, our teams produce LCC on-site and coordinate pumping and placement. Density, strength and flow characteristics are selected for the application and project requirements.

FlowableSelf-leveling placement
LightweightReduced added load
PumpableConfined access
LCC technology for underground cavity treatment
02PROBLEMS TUSANID HELPS ADDRESS

Engineering solutions for ground, structural, and service-route challenges.

Tusanid provides practical solutions according to each project’s conditions and technical requirements. Other applications include backfilling behind structures and walls, confined spaces, and foundation, road, and platform support.

Settlement and weak support zones

Settlement and weak support zones

Areas affected by settlement, loss of support, or voids beneath structures.

Underground voids and cavities

Underground voids and cavities

Selected void-filling and cavity-treatment applications where pumping access is required.

Unstable pipe and utility routes

Unstable pipe and utility routes

Support and protection where soil loss, voids, movement, or settlement are concerns.

03TYPICAL LCC APPLICATIONS

Where lightweight fill makes a difference.

Lightweight and pumpable for suitable applications, with flowable and self-leveling placement behavior. Density, strength, and flow characteristics can be configured.

01Voids beneath roads, platforms, and foundations
02Trenches and service routes
03Areas surrounding existing pipes and utilities
04Areas where conventional compaction is difficult
04TECHNICAL PROPERTIES

Density and compressive strength.

Typical 28-day compressive strengths based on cylinder tests, as shown in TUSANID’s technical profile.

Compressive strength at 28 days (MPa)
Density (kg/m³)StandardImproved 1Improved 2
6001.01.02.0
8001.52.03.0
1,0002.03.04.0
1,2002.54.06.0
1,4003.0—10.0
1,6006.010.015.0
Strength vs density at 28 days — cylinder testsStrength vs DensityAge: 28 days | Cylinder tests04812166008001000120014001600Standard: 600 kg/m³, 1 MPaStandard: 800 kg/m³, 1.5 MPaStandard: 1000 kg/m³, 2 MPaStandard: 1200 kg/m³, 2.5 MPaStandard: 1400 kg/m³, 3 MPaStandard: 1600 kg/m³, 6 MPaImproved 1: 600 kg/m³, 1 MPaImproved 1: 800 kg/m³, 2 MPaImproved 1: 1000 kg/m³, 3 MPaImproved 1: 1200 kg/m³, 4 MPaImproved 1: 1600 kg/m³, 10 MPaImproved 2: 600 kg/m³, 2 MPaImproved 2: 800 kg/m³, 3 MPaImproved 2: 1000 kg/m³, 4 MPaImproved 2: 1200 kg/m³, 6 MPaImproved 2: 1400 kg/m³, 10 MPaImproved 2: 1600 kg/m³, 15 MPaStandardImproved 1Improved 2Density (kg/m³)Compressive Strength (MPa)
No Improved 1 value at 1,400 kg/m³; the dashed line connects the available values only.
05WHAT DISTINGUISHES TUSANID

A problem-first approach with coordinated project support.

01

Start with the problem

Solutions begin with the problem, not the product. Site conditions and project requirements are reviewed first.

02

Use the right approach

LCC is used for applications that require a lightweight and pumpable material. The approach can reach confined and difficult-access areas.

03

Coordinate the work

Technical review, mix-design direction, production, pumping, and placement can be coordinated. Loads and pressures can be reduced in suitable applications.

04

Confirm quality

Quality checks and project documentation support the delivery process.

06DELIVERY METHODOLOGY

From condition to action.

The delivery pathway is organized around the actual site condition, required outcome, access limitations, and project interfaces.

STEPMETHODREVIEW FOCUS
01 UnderstandReview drawings, reports, photographs, levels, and access.Surrounding assets and constraints
02 DefineClarify the problem and required outcome.Project objective
03 AssessReview geometry, loads, ground condition, voids, services, and safety.Technical requirements
04 PlanDefine method, LCC properties, sequence, pumping, and checks.Execution plan
05 ConfirmCoordinate production, placement, inspections, and project review.Quality and documentation
07APPLICATION AREAS

LCC solutions across the project contexts.

LCC solutions can be considered across infrastructure, buildings, engineered fill, industrial, mining, and underground applications.

Infrastructure and roads

Infrastructure and roads

Settlement areas, roads, platforms, approaches, and engineered fill.

Buildings and structures

Buildings and structures

Foundations, floors, platforms, and surrounding backfill.

Mining and industrial works

Mining and industrial works

Industrial sites, underground spaces, voids, and controlled backfilling.

Pipes & utilities Roads & platforms Confined spaces Ground treatment

Additional contexts include crossings, existing services, restricted-access operating areas, and underground project interfaces.

08PROJECT INFORMATION AND CONTACT

Share the condition.
Start the review.

Submit your project details, drawings, BOQ or site photographs for an initial technical review. TUSANID can contact you by email or phone to discuss the project requirements and next steps.

Project details

PDF, JPG or PNG · Up to 5 files · 10 MiB per file · 20 MiB total

Chat on WhatsApp